Tamil Nadu Water Supply and Drainage Board (TWAD)
Tiruttani – Cherukkanur Region, Tamil Nadu
Comprehensive Water Supply Infrastructure Development
The Virudhunagar TWAD Project is a major water infrastructure initiative undertaken to enhance and stabilize the drinking water supply system across key habitations in Virudhunagar District. The project focuses on constructing new water supply components, improving existing transmission networks, and integrating sustainable pumping systems to ensure a consistent and safe water supply for residents.
This project is designed with a strong focus on engineering precision, environmental sustainability, and long-term service reliability under TWAD’s standards.
Construction of Infiltration Wells and Collection Sumps at multiple locations.
Supply, Laying, and Jointing of DI and HDPE Pipelines for pumping and feeder mains.
Installation of Valves, Chambers, and Anchoring Arrangements for network efficiency.
Erection of HSC and Submersible Motors for enhanced pumping capacity.
Construction of Pump House and Electrical Infrastructure with UG cable network.
Testing, Commissioning, and Calibration of the complete water supply system.
Construction of Pipe Carrying Bridge (PCB) and Valve Chambers at key crossings.
Supply and Installation of HOT Crane for pump house operations and maintenance.
The Virudhunagar TWAD Project stands as a milestone in the district’s water infrastructure development. It ensures uninterrupted and equitable water distribution, demonstrating Anjaneya Artery Projects Private Limited’s technical excellence, timely execution, and commitment to quality in public water supply projects.
TWAD Water Supply Improvement Project – Virudhunagar District
Construction
Water Supply Infrastructure / Rural and Urban Development
Anjaneya Artery Projects Private Limited © 2025 – All Rights Reserved